External Tenders

الارشیف External Tenders

Sequence Subject Tender numberة Publication date Closing date Attachments
1 Auxiliary Factors in PSA Hydrogen Purification Unit 850/2024 31/8/2025 30/9/2025 تحميل
2 SUPPLY New Complete Heavy Duty Centrifugal Pumps With Spare Parts 977/2025 11/8/2025 24/9/2025 تحميل
3 Supply Heavy duty industrial 4wires 400V PC, MCC and ASB 871/2024 30/7/2025 16/9/2025 تحميل
4 designed supplied and erected pressure reduction station for natural gas 968/2025 8/7/2025 7/9/2025 تحميل
5 Valves test and repair equipments 950/2025 8/7/2025 19/8/2025 تحميل
6 SUPPLY COMPLETE STEAM TURBINES WTHOUT PUMPS BASE PLATE(604,610) 870/2024 1/7/2025 11/8/2025 تحميل
7 Supply heat exchanger extractor 966/2025 29/6/2025 30/7/2025 تحميل
8 Package Crude Distillation Units Control System Revamping in Thi qar Refinery 773/2023 18/6/2025 28/7/2025 تحميل
9 Governors for all turbines 941/2025 25/6/2025 13/7/2025 تحميل
10 Supply (UPS) For Nikata Unit 945/2025 26/3/2025 12/5/2025 تحميل
11 QMT1 tube oil Electrical Substation 938/2025 19/3/2025 11/5/2025 تحميل
12 New Complete Heavy Duty Horizontal Centrifugal Pump With Spare Parts Item 2216 933/2025 24/3/2025 23/4/2025 تحميل
13 Completing Contract Deficiencies 4920 In Thi-Qar Refinery 942/2025 23/2/2025 8/4/2025 تحميل
14 workshop machines 881/2024 11/2/2025 23/3/2025 تحميل
15 Spare Parts For Cooling Tower 12000m3/h 791/2023 7/1/2025 20/2/2025 تحميل
16 SUPPLY Heavy duty industrial 4wires 400V PC, MCC and ASB 871/2024 16/12/2024 3/2/2025 تحميل
17 Fuel Oil Injection Pumps (two) with Spear parts / Maisan Refinery 868/2024 16/12/2024 5/2/2025 تحميل
18 Spare part for towers and vessels and reactors 926/2024 11/12/2024 19/1/2025 تحميل
19 Auxiliary Factors in PSA Hydrogen Purification Unit 850/2024 8/12/2024 15/1/2025 تحميل
20 Spare part for towers and vessels and reactors 926/2024 5/12/2024 19/1/2025 تحميل
21 Supply of Two Heavy Duty Industrial 400V 4 Wires power center for Electrical Substation 856/2024 5/12/2024 20/1/2025 تحميل
22 SEAMLESS TUBE FOR HEAT EXCHANGER FOR CDU3 878/2024 13/11/2024 23/12/2024 تحميل
23 Supply(Online Water Analyzers) 906/2024 29/10/2024 11/12/2024 تحميل
24 Supply Spare Parts For Nebraska Boilers 915/2024 28/10/2024 29/12/2024 تحميل
25 SUPPLY COMPLETE STEAM TURBINES WITHOUT PUMPS BASE PLATE(604,610) 870/2024 20/10/2024 11/12/2024 تحميل
26 SUPPLY New Complete Heavy Duty Centrifugal Pumps With Spare Parts 812/2023 20/10/2024 23/12/2024 تحميل
27 منظومة حماية (كشف التسريبات) انبوب النفط الخام 32 عقدة 891/2024 20/10/2024 27/11/2024 تحميل
28 Supply of GAS DETECTOR south refineries company 917/2024 20/10/2024 2/12/2024 تحميل
29 Supplying And Executing: RO Main Electrical Substation 33 KV 885/2024 16/10/2024 3/12/2024 تحميل
30 Supply new complete prefabricated skid mounted feed R.O water pumping systems 908/2024 9/10/2024 25/11/2024 تحميل
31 Design, Supply and Installation OF Electromechanical Works Industrial
Waste Water Treatment plant For Thi Qar &Missan Refineries
840/2024 29/9/2024 18/11/2024 تحميل
32 Supply Brackish, sea water Memberane and Ultrafiltration membrane For R.O Unite 909/2024 25/9/2024 13/11/2024 تحميل
33 تدريب على صيانة ومعايرة وتشغيل ماكنة دق العدد الاوكتاني 859/2024 2/9/2024 8/10/2024 تحميل
34 Petrochemical power cables 897/2024 17/9/2024 21/10/2024 تحميل
35 Supply of Two Heavy Duty Industrial 400V 4 Wires power center for Electrical Substation) 856/2024 28/8/2024 13/10/2024 تحميل
36 supplying electrical motors 2153 JA.B.C 757/2023 28/8/2024 15/10/2024 تحميل
37 Supply power transformer 904/2024 28/8/2024 9/10/2024 تحميل